• About The Project
  • Palestine in Century
  • Selected Maps
  • Glossary
  • About ARIJ
  • About LRC
  • By Year
    • Case Studies By Year
    • Daily Report By Year
Monday, September 8, 2025
POICA
No Result
View All Result
  • Home
  • Settlements
    • New Israeli Settlements
    • Settlement Expansion
  • Israeli Violations
    • Agriculture
    • Confiscation
    • Demolition
    • Environment
    • Eviction of Palestinians
    • Settlers Attacks
  • Bypass Roads
  • Israeli Plans
  • Segregation
    • Checkpoints
    • Closure
    • Separation Plans
  • Military Orders
  • Reports
    • Daily Report
    • Monthly Report
    • Quarterly Report
  • Home
  • Settlements
    • New Israeli Settlements
    • Settlement Expansion
  • Israeli Violations
    • Agriculture
    • Confiscation
    • Demolition
    • Environment
    • Eviction of Palestinians
    • Settlers Attacks
  • Bypass Roads
  • Israeli Plans
  • Segregation
    • Checkpoints
    • Closure
    • Separation Plans
  • Military Orders
  • Reports
    • Daily Report
    • Monthly Report
    • Quarterly Report
No Result
View All Result
POICA
No Result
View All Result

إصدار إعلاناً بتطوير المخطط الهيكلي لمستوطنة ألفيه منشيه

November 24, 2012
in Settlements

 




 



  • الانتهاك: الاحتلال الإسرائيلي يصدر إعلانا بتطوير المخطط الهيكلي لمستعمرة إسرائيلية.


  • الموقع: مستعمرة ألفيه منشيه.


  • تاريخ الانتهاك: الجمعة 23 تشرين ثاني 2012م.

الانتهاك:

 

في خطوة جديدة، تعكس واقع الاحتلال الذي يسعى إلى تكريس الاستيطان في الضفة الغربية، بل تطوير البنى التحتية للمستوطنات الإسرائيلية بهدف استقطاب اكبر قدر ممكن من المستعمرين لسكانهم في الأراضي المحتلة. أصدرت ما تسمى اللجنة الفرعية للاستيطان التابعة لما تسمى الإدارة المدنية الإسرائيلية  في صباح الجمعة 23 تشرين ثاني 2012 عبر صحيفة القدس إخطاراً يتضمن الإعلان عن إيداع المخطط التفصيلي رقم (5/15) والذي يعد بمثابة تعديلاً للمخطط التنظيم الإقليمي s-15   الموجود في الحوض الطبيعي رقم 2 من أراض بلدة عزون الشمالية في محافظة قلقيلية في موقع  ‘قرنة القعدة’   و ‘ واد اللبثاوي’ و ‘خلة الغيلان’.

 

تجدر الإشارة انه وبحسب ما ورد عن الإخطار العسكري  فان الهدف الرئيس من الإعلان هو تطوير البنية التحتية في الجهة الجنوبية الغربية من المستوطنة عبر شق المزيد من الطرق داخل حدود المستوطنة ومد شبكة كهرباء بهدف تطوير البنية التحتية فيها لاستيعاب بناء منازل جديدة هناك، مع الإشارة إلى أن الأحواض التي تقع شملها الإعلان من أراض بلدة  عزون هي بالأصل مصادرة منذ أكثر من 16 عاماً وتقع في داخل حدود المستوطنة.

 


معلومات عامة عن مستوطنة ألفيه منشيه:

 

تقع هذه المستوطنة إلى الجنوب الشرقي من مدينة قلقيلية، أقيمت في العام 1981 م، على أراضي كل من قرية كفر ثلث وبلدات عزون وعسلة والنبي الياس، وهي مستوطنة مدنية يسكنها اليهود العلمانيون، قريبة جدا عن الخط الأخضر، حيث تبعد عنه حوالي 5 كم، لذلك يلجا الكثير من المستوطنين للسكن فيها، حيث بلغ عدد المستوطنين بها لغاية عام 2008م قرابة 6400مستوطن، في حين تبلغ مساحتها الإجمالية 5300 دونم. 

 






 

 

توسعت المستوطنة مع الوقت حيث أضيف لها العديد من الأقسام: القسم الأول بالاتجاه الشرقي بلدة عسلة القسم الثاني بالاتجاه الشمالي حتى بلدة النبي الياس أما القسم الثالث: فهو قيد الإنشاء بالاتجاه الجنوبي الشرقي باتجاه بلدة رأس طيره على جبل يدعى جبل القسطل تبلغ ( 2000 ) دونم، ‘ لم تضاف إلى مساحة المستوطنة’ ويتم بناء 500 وحدة سكنية قيد الإنشاء. أبرز معالم المستوطنة: التصميم الهندسي لها على شكل طائرة عمودية، يوجد في المستوطنة منطقة صناعية تقع على مدخلها بها أكثر من (30 ) مصنع وورشة، كما يوجد بها محطة بترول، مدارس حتى الثانوية، مسبح ضخم، ملاعب رياضية، كنيس ، برج مراقبة عسكري. 

 

 

 

 

 
اعداد: مركز أبحاث الاراضي – القدس

 



 

 

 

 

Recommended For You

Israeli Breach of the Hebron Agreement through the Establishment of a New Settlement in Area (H1)

by arij
August 26, 2025
0
Israeli Breach of the Hebron Agreement through the Establishment of a New Settlement in Area (H1)

Introduction In a new provocative move, the Israeli occupation authorities have established a new settlement outpost in the heart of Hebron, specifically in Area (H1), which is under...

Read moreDetails

خرق إسرائيلي لاتفاقية الخليل بإنشاء مستوطنة جديدة في منطقة (H1)

by arij
August 26, 2025
0
خرق إسرائيلي لاتفاقية الخليل بإنشاء مستوطنة جديدة في منطقة (H1)

المقدمة في خطوة استفزازية جديدة، أقدمت سلطات الاحتلال الإسرائيلي على وضع بؤرة استيطانية جديدة في قلب مدينة الخليل، وتحديدا في منطقة (H1) الخاضعة للسيطرة الفلسطينية الكاملة وفق اتفاقية...

Read moreDetails

Escalation and forced displacement in Kisan

by arij
August 6, 2025
0

The village of Kisan, located southeast of the Bethlehem Governorate, has faced continuous attacks for many years by settlers and Israeli occupation forces as part of a systematic...

Read moreDetails

بؤرة استيطانية جديدة وتهجير قسري في كيسان

by arij
August 6, 2025
0

موقع الاستهداف، تقع قرية كيسان جنوب شرق محافظة بيت لحم، وتواجه منذ سنوات طويلة هجمات متواصلة من قبل المستوطنين وقوات الاحتلال الإسرائيلي ضمن سياسة ممنهجة تهدف إلى السيطرة...

Read moreDetails

Expansion of Gilo Settlement: A Strategic Plan to Isolate Bethlehem and Undermine Palestinian Rights

by arij
May 12, 2025
0
Expansion of Gilo Settlement: A Strategic Plan to Isolate Bethlehem and Undermine Palestinian Rights

The Israeli Civil Administration has announced a new settlement expansion plan—No. 101-1284223—which outlines the construction of 1,990 new settlement units on approximately 175.9 dunums of land extending towards...

Read moreDetails
Next Post

A plan to expand the organizational plan of Alve Menshe colony

LATEST NEWS

Israeli Breach of the Hebron Agreement through the Establishment of a New Settlement in Area (H1)

Israeli Breach of the Hebron Agreement through the Establishment of a New Settlement in Area (H1)

by arij
August 26, 2025
0

........................................................

خرق إسرائيلي لاتفاقية الخليل بإنشاء مستوطنة جديدة في منطقة (H1)

خرق إسرائيلي لاتفاقية الخليل بإنشاء مستوطنة جديدة في منطقة (H1)

by arij
August 26, 2025
0

........................................................

” المواقع الأثرية في محافظة نابلس… ساحة مفتوحة أمام مخططات المصادرة الإسرائيلية “

” المواقع الأثرية في محافظة نابلس… ساحة مفتوحة أمام مخططات المصادرة الإسرائيلية “

by arij
August 26, 2025
0

........................................................

مشروع (E1): الضربة القاضية لحل الدولتين وإعادة تشكيل الخريطة الجيوسياسية للضفة الغربية

The Government Pushes Forward Plans in E1, Considered a Death Blow to the Two-State Solution

by arij
August 16, 2025
0

........................................................

flag_yellow_lowEU-PfP-Logo

This website has been produced with the assistance of the European Union. The contents of this publication are the sole responsibility of ARIJ & LRC and can in no way be taken to reflect the views of the European Union.

© 2025 Copyright ARIJ . All Rights reserved. .

No Result
View All Result
  • Home
  • Settlements
    • New Israeli Settlements
    • Settlement Expansion
  • Israeli Violations
    • Agriculture
    • Confiscation
    • Demolition
    • Environment
    • Eviction of Palestinians
    • Settlers Attacks
  • Bypass Roads
  • Israeli Plans
  • Segregation
    • Checkpoints
    • Closure
    • Separation Plans
  • Military Orders
  • Reports
    • Daily Report
    • Monthly Report
    • Quarterly Report

© 2025 Copyright ARIJ . All Rights reserved. .